• DocumentCode
    1020125
  • Title

    Emergency Overloading or Air-Cooled Oil-Immersed Power Transformers by Hot-Spot Temperatures

  • Author

    Montsinger, V.M. ; Ketchum, P.M.

  • Author_Institution
    Research engineer, General Electric Company, Pittsfield, Mass.
  • Volume
    61
  • Issue
    12
  • fYear
    1942
  • Firstpage
    906
  • Lastpage
    916
  • Abstract
    The paper points out that during the period of the war the need for obtaining maximum transformer overload capacity is very great, particularly under rare emergency conditions. From a thermal standpoint, the amount of overload is limited by the hottest spot in the transformer winding. To obtain accurate data 1. On the actual hot-spot temperatures under rated load conditions 2. On the increase of the hot spot with load under both ultimate moderate overload and heavy short-time overload conditions approximately 50 heat runs were made on several power transformers of different ratings, representing a wide variety of design conditions. The results of the tests are given in the paper. The subject of how heavy overloads affect the life of transformers, is discussed and temperature limits somewhat higher than those given in the American Standards, Guides for Operation of Transformers, are suggested. Calcul??ted short-time overloads are given to show the effect of transformer characteristics on overload values.
  • Keywords
    Coils; Electric variables measurement; Power generation economics; Power measurement; Power transformer insulation; Power transformers; Reservoirs; Temperature measurement; Testing; Windings;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1942.5058462
  • Filename
    5058462