Title :
Capacitor Installation at Newport News
Author :
Parrack, V.R. ; Harder, E.L.
Author_Institution :
Distribution engineer, Virginia Public Service Company, Charlottesville, Va.
Keywords :
Absorption; Automatic control; Circuit stability; Costs; Inductance; Propagation losses; Springs; Switched capacitor circuits; Transformers; Transmission lines;
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
DOI :
10.1109/T-AIEE.1944.5058860