Abstract
In the increasingly competitive electric utility industry, there is an emerging need for the diverse parties using the transmission system to understand transmission planning. In this paper, the authors discuss features of transmission planning that are problematic in such an environment. Reference is made to a number of transmission system expansion and access disputes. Transmission software models are also discussed
Keywords
economics; electricity supply industry; power engineering computing; power system planning; transmission networks; competitive economic environment; electric utility industry; software models; transmission planning; transmission system access; transmission system expansion; Capacity planning; Costs; Economies of scale; Environmental economics; Laboratories; Meeting planning; Power generation; Power generation economics; Power system interconnection; Power system planning;
fLanguage
English