Title :
Construction and testing of the mirror fusion test facility magnets
Author :
Kozman, T. ; Shimer, D. ; VanSant, J. ; Zbasnik, J.
Author_Institution :
University of California, Berkeley, CA
fDate :
3/1/1987 12:00:00 AM
Abstract :
This paper describes the construction and testing of the Mirror Fusion Test Facility superconducting magnet set. Construction of the first Yin Yang magnet was started in 1978. And although this particular magnet was later modified, the final construction of these magnets was not completed until 1985. When completed these 42 magnets weighed over 1200 tonnes and had a maximum stored energy of approximately 1200 MJ at full field. Together with power supplies, controls and liquid nitrogen radiation shields the cost of the fabrication of this system was over $100M. General Dynamics/Convair Division was responsible for the system design and the fabrication of 20 of the magnets. This contract was the largest single procurement action at the Lawrence Livermore National Laboratory. During the PACE acceptance tests, the 26 major magnets were operated at full field for more than 24 hours while other MFTF subsystems were tested. From all of the data, the magnets operated to the performance specifications. For physics operation in the future, additional helium and nitrogen leak checking and repair will be necessary. In this report we will discuss the operation and testing of the MFTF Magnet System, the world´s largest superconducting magnet set built to date. The topics covered include a schedule of the major events, summary of the fabrication work, summary of the installation work, summary of testing and test results, and lessons learned.
Keywords :
Superconducting magnets, plasma confinement; Contracts; Control systems; Costs; Fabrication; Mirrors; Nitrogen; Power supplies; Superconducting magnets; Test facilities; Testing;
Journal_Title :
Magnetics, IEEE Transactions on
DOI :
10.1109/TMAG.1987.1065101