DocumentCode :
1028017
Title :
Issues in FMS installation: a field study and analysis
Author :
Kunnathur, Anand N. ; Sundararaghavan, P.S.
Author_Institution :
Dept. of Inf. Syst. & Oper. Manage., Toledo Univ., OH, USA
Volume :
39
Issue :
4
fYear :
1992
fDate :
11/1/1992 12:00:00 AM
Firstpage :
370
Lastpage :
377
Abstract :
This report is based on plant visits and extensive interviews conducted as part of the authors´ field study of five distinct flexible manufacturing system (FMS) installations. The FMS and the settings they are housed in are described. The findings are integrated with the existing published literature on automation in manufacturing. The literature is confirmed in some respects and is augmented in many instances. A critical analysis of these installations is presented, indicating the problems associated with them and identifying probable causes. Based on their visits and the analysis, the authors developed an implementation plan for proactive management of automation project. It is hoped that it will help to avoid the pitfalls identified and to regain and retain competitive advantage
Keywords :
computer installation; flexible manufacturing systems; management; FMS installation; automation project; flexible manufacturing system; proactive management; Automatic control; Flexible manufacturing systems; Machine tools; Machinery; Manufacturing automation; Manufacturing industries; Materials handling; Portfolios; Productivity; Project management;
fLanguage :
English
Journal_Title :
Engineering Management, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9391
Type :
jour
DOI :
10.1109/17.165421
Filename :
165421
Link To Document :
بازگشت