• DocumentCode
    1028232
  • Title

    GENCO´s Risk-Based Maintenance Outage Scheduling

  • Author

    Wu, Lei ; Shahidehpour, Mohammad ; Li, Tao

  • Author_Institution
    Illinois Inst. of Technol., Chicago
  • Volume
    23
  • Issue
    1
  • fYear
    2008
  • Firstpage
    127
  • Lastpage
    136
  • Abstract
    This paper presents a stochastic model for the optimal risk-based generation maintenance outage scheduling based on hourly price-based unit commitment in a generation company (GENCO). Such maintenance outage schedules will be submitted by GENCOs to the ISO for approval before implementation. The objective of a GENCO is to consider financial risks when scheduling its midterm maintenance outages. The GENCO also coordinates its proposed outage scheduling with short-term unit commitment for maximizing payoffs. The proposed model is a stochastic mixed integer linear program in which random hourly prices of energy, ancillary services, and fuel are modeled as scenarios in the Monte Carlo method. Financial risks associated with price uncertainty are considered by applying expected downside risks which are incorporated explicitly as constraints. This paper shows that GENCOs could decrease financial risks by adjusting expected payoffs. Illustrative examples show the calculation of GENCO´s midterm generation maintenance schedule, risk level, hourly unit commitment, and hourly dispatch for bidding into energy and ancillary services markets.
  • Keywords
    Monte Carlo methods; integer programming; linear programming; power generation economics; power generation scheduling; preventive maintenance; risk management; Monte Carlo methods; financial risks; generation maintenance outage scheduling; mixed integer linear program; power hourly price; price uncertainty; stochastic model; unit commitment; Contracts; Costs; Electricity supply industry; Fuels; ISO; Linear programming; Spinning; Stochastic processes; Uncertainty; Upper bound; Monte Carlo simulation; optimal generation maintenance outage scheduling; price-based unit commitment; risk-based GENCOs; stochastic mixed integer programming;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2007.913295
  • Filename
    4425383