• DocumentCode
    1028694
  • Title

    Tennessee Valley Authority´s 500-kY System - System Plans and Considerations

  • Author

    Chambers, F. ; Hammer, O.S.C. ; Edwards, L.

  • Author_Institution
    Tennessee Valley Authority
  • Issue
    1
  • fYear
    1966
  • Firstpage
    22
  • Lastpage
    28
  • Abstract
    Insulation requirements for the Tennessee Valley Authority´s new 500-kV transmission system were found to be dictated by switching surge transient voltages rather than by lightning surges. Plans and considerations studied by the Tennessee Valley Authority in relation to the employment of 500-kV transmission are presented as comparative data which might be helpful to others interested in EHV installations. Descriptions are given of voltage levels and bundle conductors selected, subconductor arrangements, application of shunt compensation, reactive power supply, lightning performance, system stability, system grounding, insulation requirements, 500-kV bus arrangements and relaying, and transformer capabilities meeting the needs of 500-kV transmission in the TVA service area.
  • Keywords
    Conductors; Employment; Grounding; Lightning; Power supplies; Power transformer insulation; Reactive power; Stability; Surges; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1966.291516
  • Filename
    4072931