DocumentCode
1028694
Title
Tennessee Valley Authority´s 500-kY System - System Plans and Considerations
Author
Chambers, F. ; Hammer, O.S.C. ; Edwards, L.
Author_Institution
Tennessee Valley Authority
Issue
1
fYear
1966
Firstpage
22
Lastpage
28
Abstract
Insulation requirements for the Tennessee Valley Authority´s new 500-kV transmission system were found to be dictated by switching surge transient voltages rather than by lightning surges. Plans and considerations studied by the Tennessee Valley Authority in relation to the employment of 500-kV transmission are presented as comparative data which might be helpful to others interested in EHV installations. Descriptions are given of voltage levels and bundle conductors selected, subconductor arrangements, application of shunt compensation, reactive power supply, lightning performance, system stability, system grounding, insulation requirements, 500-kV bus arrangements and relaying, and transformer capabilities meeting the needs of 500-kV transmission in the TVA service area.
Keywords
Conductors; Employment; Grounding; Lightning; Power supplies; Power transformer insulation; Reactive power; Stability; Surges; Voltage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1966.291516
Filename
4072931
Link To Document