• DocumentCode
    1029634
  • Title

    345-kY Underground Transmission on the Consolidated Edison Company of New York System

  • Author

    Hatcher, C.T. ; Gillette, R.W. ; Burrell, R.W.

  • Author_Institution
    Consolidated Edison Company
  • Issue
    4
  • fYear
    1966
  • fDate
    4/1/1966 12:00:00 AM
  • Firstpage
    353
  • Lastpage
    360
  • Abstract
    In 1953, it was foreseen by electric utilities that, in approximately 10 years, underground 345-kV transmission would be required in some areas. In the 1960s, it became desirable to extend 345-kV transmission circuits underground into the New York City metropolitan area. On the basis of information obtained from the Cornell research project, it was possible to plan and install a large commercial installation; approximately 60 circuit miles are now in service. The capability of one circuit is over 500 MVA, and with capabilities of this order there is a decided economic advantage over presently used lower transmission voltages.
  • Keywords
    Circuit testing; Cities and towns; Communication cables; Conductors; Costs; Power generation economics; Power system economics; Research and development; Temperature; Urban areas;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1966.291570
  • Filename
    4073041