DocumentCode
1029797
Title
Optimal Solution to the Hydro-Steam Dispatch Problem for Certain Practical Systems
Author
Dahlin, E.B. ; Shen, D.W.C.
Author_Institution
IBM Corporation, Control Systems Development Center
Issue
5
fYear
1966
fDate
5/1/1966 12:00:00 AM
Firstpage
437
Lastpage
458
Abstract
The maximum principle by Pontryagin is applied to the problem of determining the operation of a hydro-steam generating system for the minimum generating costs. The general dispatch formulas are derived for power systems with hydroelectric plants having fixed head, varying head, and hydraulic coupling, both with and without river transport delay and wave phenomena. Techniques are demonstrated which greatly simplify the computer solutions for fixed and varying head operation.
Keywords
Calculus; Control systems; Costs; Hydroelectric power generation; Lagrangian functions; Power generation economics; Power systems; Propagation delay; Rivers; Water storage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1966.291681
Filename
4073060
Link To Document