DocumentCode
1029815
Title
Dispatching Pumped Storage Hydro
Author
Mcdaniel, G.H. ; Gabrielle, A.F.
Author_Institution
American Electric Power Service Corporation
Issue
5
fYear
1966
fDate
5/1/1966 12:00:00 AM
Firstpage
465
Lastpage
471
Abstract
While the economic factors associated with the planning and design of a pumped storage hydro project must include system operation concepts, the day to day operation of a given pumped hydro project presents a different set of economic decisions. In this connection, the array of data or information that must be presented to the dispatcher is, of necessity, different in form from that presented to the planner. Therefore, the scope of discussion is limited to the problem of day to day and minute to minute scheduling and dispatching pumped storage hydro in combination with steam generating capacity in an optimum manner. The example used for discussion is the Smith Mountain pumped storage project.
Keywords
Data analysis; Dispatching; Energy storage; Power generation; Power generation economics; Recycling; Reservoirs; Rivers; Scheduling; Water storage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1966.291683
Filename
4073062
Link To Document