• DocumentCode
    1030366
  • Title

    Minimum Phase-to-Phase Electrical Clearances for Substations Based on Switching Surges and Lightning Surges

  • Author

    Udo, T.

  • Author_Institution
    Central Research Institute, Electric Power Industry
  • Issue
    8
  • fYear
    1966
  • Firstpage
    838
  • Lastpage
    845
  • Abstract
    One method has been developed for estimating phase-to-phase clearances to withstand switching surge voltages and lightning surges in substations. Consideration has been given to the simultaneous occurrence of opposite polarity switching surges on adjacent phases, and propagating characteristics of lightning surges on the transmission lines.
  • Keywords
    Circuit testing; Earth; Electrodes; Laboratories; Lightning; Optical propagation; Substations; Surges; Transmission lines; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1966.291623
  • Filename
    4073124