DocumentCode
1031068
Title
Centralized Power Control of 65 000-Horsepower Pump Motors at Grand Coulee Dam
Author
Barker, G.
Author_Institution
U.S. Department of the Interior, Bureau of Reclamation
Issue
11
fYear
1967
Firstpage
1356
Lastpage
1361
Abstract
The facilities of the Grand Coulee Pumping Plant and the original starting procedures used for the 65 000-hp synchronous motor-driven pumps are briefly described, followed by a description and schematic diagrams of the controls now used in the automatic centralized power control scheme. The starting, stopping, and remote annunciation systems associated with the pumps are described in detail. A description of the control system for the 108 000-kW generator associated with the pump unit is also included. The system has proved very satisfactory, and after one season of operation with the centralized power control scheme, only two minor modifications were made to provide greater reliability.
Keywords
Control systems; Induction generators; Irrigation; Power control; Power generation; Power system reliability; Switches; Switching circuits; Synchronous motors; Water storage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1967.291812
Filename
4073208
Link To Document