  • Abstract
    The first major high-voltage pipe-type installation in this country to be installed without any stop joints and the first in which the cable was shipped without the conventional temporary lead sheath was placed in service in June 1947, by New Orleans Public Service, Incorporated. This installation incorporates a number of novel design features of unusual interest. The paper describes these features and reports the results of tests and studies carried out in connection with this installation.
  • Keywords
    Cable TV; Circuits; Cities and towns; Irrigation; Mechanical cables; Oil filled cables; Power cable insulation; Power cables; Soil; Steel;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1948.5059697
  • Filename
    5059697