DocumentCode
1031747
Title
115-Kv High-Pressure Oil-Filled Pipe Cable Installation at New Orleans, La.
Author
Bullard, W.R. ; Pettee, A.D. ; Rhodes, G.L.
Author_Institution
Electrical engineer with Ebasco Services Inc., New York, N. Y.
Volume
67
Issue
1
fYear
1948
Firstpage
475
Lastpage
486
Abstract
The first major high-voltage pipe-type installation in this country to be installed without any stop joints and the first in which the cable was shipped without the conventional temporary lead sheath was placed in service in June 1947, by New Orleans Public Service, Incorporated. This installation incorporates a number of novel design features of unusual interest. The paper describes these features and reports the results of tests and studies carried out in connection with this installation.
Keywords
Cable TV; Circuits; Cities and towns; Irrigation; Mechanical cables; Oil filled cables; Power cable insulation; Power cables; Soil; Steel;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1948.5059697
Filename
5059697
Link To Document