• DocumentCode
    1034286
  • Title

    Impulse, Switching Surge, and 60-Hz Sparkover Tests by Three Laboratories on a 500-kY Ring-to-Rod Protective Gap

  • Issue
    3
  • fYear
    1968
  • fDate
    3/1/1968 12:00:00 AM
  • Firstpage
    713
  • Lastpage
    721
  • Abstract
    The objective is to promote a better understanding of protective gaps, their characteristics, influence of design factors on perfornance, applications, and limitations. Accordingly, the Working Group sponsored sparkover tests on a proposed 500-kV ring-to-rod protective gap. Comparative tests were conducted at laboratories of the Ohio Brass Company, the Hydro-Electric Power Commission of Ontario, and the Bonneville Power Administration. This paper summarizes and compares the impulse, switching surge, and 60-Hz sparkover test results.
  • Keywords
    Circuit testing; Corona; Electrodes; Impulse testing; Insulation; Insulator testing; Laboratories; Surge protection; Test facilities; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1968.292184
  • Filename
    4073554