• DocumentCode
    1034444
  • Title

    The John Day Powerhouse

  • Author

    Meloy, Glenn R.

  • Author_Institution
    U.S. Army Engineer Division, North Pacific, Corps of Engineers
  • Issue
    3
  • fYear
    1968
  • fDate
    3/1/1968 12:00:00 AM
  • Firstpage
    854
  • Lastpage
    859
  • Abstract
    Salient features of the powerhouse design include selection of an indoor-type powerhouse and elimination of a generator floor; implementation of a control philosophy stating that the control room should only be provided with the control elements which would be provided at a remote control station and a basic requirement that control functions and equipment should be flexible as regards modification to suit future operating requirements; installation of a digital operations controller which is intended to lead to future closed-loop control of the plant; grouping of four large hydro units on each 500-kV transformer bank; and standardization of the design to include Lower Monumental and Little Goose Projects to effect savings in design and equipment procurement costs.
  • Keywords
    Assembly; Costs; Power engineering and energy; Power generation; Power generation economics; Procurement; Protection; Rivers; Switching circuits; Turbines;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1968.292201
  • Filename
    4073571