DocumentCode
1034841
Title
Fast, cheap requirements prototype, or else!
Author
Andriole, Stepben J.
Author_Institution
Drexel Univ., Philadelphia, PA, USA
Volume
11
Issue
2
fYear
1994
fDate
3/1/1994 12:00:00 AM
Firstpage
85
Lastpage
87
Abstract
Managing requirements modeling and prototyping is risky. If things go awry, projects can spiral out of control. Over the years, with the help of colleagues from industry and academia, the author has identified a requirements modeling and prototyping process that is fast, powerful, cost-effective, sane, and objective. The main lesson learnt is that throwaway prototyping (sometimes called exploratory prototyping) is always cost-effective and always improves specifications. The process has nine steps: elicit initial requirements; model requirements; identify constraints; prioritize initial requirements; design; evaluate designs; specification; interactive prototyping; and requirements validation.<>
Keywords
formal specification; software prototyping; systems analysis; cheap requirements prototype; constraints; exploratory prototyping; initial requirements; interactive prototyping; prototyping process; requirements modeling; requirements modeling management; requirements validation; specification; throwaway prototyping; Acceleration; Design engineering; FAA; Impedance; Packaging; Power engineering and energy; Prototypes; Silicon carbide; Springs; Writing;
fLanguage
English
Journal_Title
Software, IEEE
Publisher
ieee
ISSN
0740-7459
Type
jour
DOI
10.1109/52.268964
Filename
268964
Link To Document