DocumentCode :
1036942
Title :
Synchronous Starting of Seneca Pumped Storage Plant
Author :
Fitzgerald, John P. ; Groscup, Garrett W. ; Cooper, Edgar A. ; Byerly, Richart T. ; Whitney, Eugene C.
Author_Institution :
The Cleveland Electric Illuminating Company
Issue :
4
fYear :
1969
fDate :
4/1/1969 12:00:00 AM
Firstpage :
307
Lastpage :
315
Abstract :
The synchronous starting method will be used at the Seneca Pumped Storage Plant when the two 220-MVA machines are started as motors. A 29-MVA generator will supply the driving power. Because the relative difference in machine size is greater than has been encountered in any existing plant, an extensive study was conducted to determine that reliable starting performance can be attained. Model tests and digital simulation have been used to investigate dynamic starting performance for a variety of conditions. A novel formulation of equations describing dynamic relationships of the two-machine system lends itself to efficient digital computation. Controls have been designed to permit reliable automatic remote control.
Keywords :
Automatic control; Digital simulation; Equations; Power generation; Power supplies; Power system modeling; Power system reliability; Pumps; Synchronous motors; Testing;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1969.292451
Filename :
4073837