DocumentCode :
1037542
Title :
Monitoring Electric-Load Forecasts
Author :
Hubbard, J.C.
Author_Institution :
Baltimore Gas and Electric Company
Issue :
6
fYear :
1969
fDate :
6/1/1969 12:00:00 AM
Firstpage :
797
Lastpage :
801
Abstract :
A program that compares substation summer peak-load forecasts with actual early summer loads which have been adjusted to normal summer peak weather conditions is described. The comparsion shows which forecasts appear low relative to the adjusted early summer loads. Used with substation capability, the results show which substations will become critically loaded sooner than present forecasts indicate. The advantage gained from the method is that necessary equipment changes can be made in a more orderly manner.
Keywords :
Adders; Circuits; Humidity; Load forecasting; Monitoring; Process planning; Stress; Substations; Temperature distribution; Weather forecasting;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1969.292394
Filename :
4073906
Link To Document :
بازگشت