• DocumentCode
    1037542
  • Title

    Monitoring Electric-Load Forecasts

  • Author

    Hubbard, J.C.

  • Author_Institution
    Baltimore Gas and Electric Company
  • Issue
    6
  • fYear
    1969
  • fDate
    6/1/1969 12:00:00 AM
  • Firstpage
    797
  • Lastpage
    801
  • Abstract
    A program that compares substation summer peak-load forecasts with actual early summer loads which have been adjusted to normal summer peak weather conditions is described. The comparsion shows which forecasts appear low relative to the adjusted early summer loads. Used with substation capability, the results show which substations will become critically loaded sooner than present forecasts indicate. The advantage gained from the method is that necessary equipment changes can be made in a more orderly manner.
  • Keywords
    Adders; Circuits; Humidity; Load forecasting; Monitoring; Process planning; Stress; Substations; Temperature distribution; Weather forecasting;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1969.292394
  • Filename
    4073906