DocumentCode
1037542
Title
Monitoring Electric-Load Forecasts
Author
Hubbard, J.C.
Author_Institution
Baltimore Gas and Electric Company
Issue
6
fYear
1969
fDate
6/1/1969 12:00:00 AM
Firstpage
797
Lastpage
801
Abstract
A program that compares substation summer peak-load forecasts with actual early summer loads which have been adjusted to normal summer peak weather conditions is described. The comparsion shows which forecasts appear low relative to the adjusted early summer loads. Used with substation capability, the results show which substations will become critically loaded sooner than present forecasts indicate. The advantage gained from the method is that necessary equipment changes can be made in a more orderly manner.
Keywords
Adders; Circuits; Humidity; Load forecasting; Monitoring; Process planning; Stress; Substations; Temperature distribution; Weather forecasting;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1969.292394
Filename
4073906
Link To Document