• DocumentCode
    1037589
  • Title

    A Swing Relay for the East-West Intertie

  • Author

    Schleif, Ferber R. ; Lloyd, Lester W., Jr. ; World, Richard W. ; Gish, William B.

  • Author_Institution
    Bureau of Reclamation
  • Issue
    6
  • fYear
    1969
  • fDate
    6/1/1969 12:00:00 AM
  • Firstpage
    821
  • Lastpage
    825
  • Abstract
    Closure of the ties to interconnect power systems across the continent has imposed new relaying problems for which new solutions have been developed. A special relay has been monitoring the East-West Intertie since it was reestablished December 3, 1967. It is designed to sense conditions of the interarea tie and to anticipate when interchange is approaching difficulty. Power, rate-of-change of power, and oscillation quantities are employed. The relay, installed at the Yellowtail Power Plant in Montana, also effects transfer tripping at Fort Peck, Mont., and at Stegall, Neb., for prompt, clean East-West separations with minimum disturbance to the systems.
  • Keywords
    Continents; Power engineering and energy; Power generation; Power system interconnection; Power system modeling; Power system planning; Power system relaying; Power transmission lines; Protective relaying; Relays;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1969.292398
  • Filename
    4073910