DocumentCode :
1038061
Title :
The CAPCO Group Probability Technique for Timing Capacity Additions and Allocation of Capacity Responsibility
Author :
Firestone, Lynn ; Monteith, Alexander H. ; Masters, William D.
Author_Institution :
Ohio Edison Company
Issue :
8
fYear :
1969
Firstpage :
1174
Lastpage :
1182
Abstract :
This paper presents an extension in the use of probability techniques for analyzing a system´s generation reserve position. A probabilistic capacity model is merged with a load model to develop the expected frequency distribution of daily capacity margins; an analysis of the computed capacity margins leads to the direct determination of a system´s dependence upon and contribution to a total generating reserve situation as a member of a coordinating group. This technique provides the necessary data upon which judgment and decision can be based in comparing alternate capacity expansion plans, timing capacity additions, or allocating the capacity responsibility among members of a coordinating group.
Keywords :
Acceleration; Capacity planning; Distributed computing; Frequency; Load modeling; Power generation economics; Power system economics; Power system planning; Power system reliability; Timing;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1969.292443
Filename :
4073963
Link To Document :
بازگشت