Title :
Elements of System Capacity Requirements
Author_Institution :
Pennsylvania Water & Power Company, Baltimore, Md.
fDate :
7/1/1951 12:00:00 AM
Keywords :
Boilers; Capacity planning; Character generation; Costs; Frequency; Maintenance; Probability; Reliability; Reservoirs; Turbines;
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
DOI :
10.1109/T-AIEE.1951.5060544