DocumentCode :
1040554
Title :
Rapid Transit Developments In Toronto
Author :
Inglis, J.G.
Author_Institution :
Toronto Transportation Commission, Toronto, Canada.
Volume :
70
Issue :
2
fYear :
1951
fDate :
7/1/1951 12:00:00 AM
Firstpage :
1262
Lastpage :
1265
Abstract :
The construction of Canada´s first subway is scheduled for completion in the City of Toronto by the end of 1953. Since there were no standards to be continued, full advantage was taken of new methods and materials. A brief description is given of much of the equipment, particularly the cars which will be 130 in number and of the lightweight Presidents´ Conference Committee(PCC) type.
Keywords :
Automotive materials; Boats; Cities and towns; Continents; Costs; Delay; Power supplies; Rails; Transportation; Urban areas;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
Publisher :
ieee
ISSN :
0096-3860
Type :
jour
DOI :
10.1109/T-AIEE.1951.5060556
Filename :
5060556
Link To Document :
بازگشت