DocumentCode
1043678
Title
Control system replacement at the Reid Gardner Station
Author
Davis, Jon F. ; Julian, Gary A.
Author_Institution
Nevada Power Co., Las Vegas, NV, USA
Volume
3
Issue
2
fYear
1988
fDate
6/1/1988 12:00:00 AM
Firstpage
225
Lastpage
229
Abstract
The scope and schedule of the first phase of a two-unit control system replacement at the Reid Gardner Station are described. This project was undertaken so that the tie-in of control system equipment coincided with major boiler rework and without additional outage time for the control system replacement work. The units in this project were typical in size and equipment type
Keywords
control systems; power station computer control; power stations; Reid Gardner Station; boiler rework; two-unit control system replacement; Automatic control; Boilers; Control systems; Furnaces; Hardware; Logic; Petroleum; Power generation; Pressure control; Temperature control;
fLanguage
English
Journal_Title
Energy Conversion, IEEE Transactions on
Publisher
ieee
ISSN
0885-8969
Type
jour
DOI
10.1109/60.4722
Filename
4722
Link To Document