• DocumentCode
    1043678
  • Title

    Control system replacement at the Reid Gardner Station

  • Author

    Davis, Jon F. ; Julian, Gary A.

  • Author_Institution
    Nevada Power Co., Las Vegas, NV, USA
  • Volume
    3
  • Issue
    2
  • fYear
    1988
  • fDate
    6/1/1988 12:00:00 AM
  • Firstpage
    225
  • Lastpage
    229
  • Abstract
    The scope and schedule of the first phase of a two-unit control system replacement at the Reid Gardner Station are described. This project was undertaken so that the tie-in of control system equipment coincided with major boiler rework and without additional outage time for the control system replacement work. The units in this project were typical in size and equipment type
  • Keywords
    control systems; power station computer control; power stations; Reid Gardner Station; boiler rework; two-unit control system replacement; Automatic control; Boilers; Control systems; Furnaces; Hardware; Logic; Petroleum; Power generation; Pressure control; Temperature control;
  • fLanguage
    English
  • Journal_Title
    Energy Conversion, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8969
  • Type

    jour

  • DOI
    10.1109/60.4722
  • Filename
    4722