Abstract :
Several independent studies have been made recently to determine the economies of a large, uniform power system. The two studies of more general interest were those conducted by the Department of the Interior, under the direction of W. S. Murray, for the Superpower Zone, and by F. G. Baum for the United States. Both of these investigations are available in published form. During the progress of the Superpower Survey, one of the longest transmission lines proposed was that extending 350 miles from the Niagara Falls Development to New York City. Under emergency conditions on this line, the power limit for the maximum amount of power was approached by two twin-circuit tower lines with three circuits carrying the emergency load. The maximum power limit would have been exceeded if two single-circuit tower lines had been employed, even though the transmission voltages and the total copper cross-section were the same as with the two twin-circuit tower lines. Similarly, several long, high-voltage lines will be required in a nation-wide system, especially through the middle western region as shown by Mr. Baum´s report. The tendency to extensive transmission systems has emphasized the necessity of considering the factors which will limit the amount of power that can be transmitted any distance with the highest practical transmission voltage.