Title :
Development and Installation of 138 KV Cable Systems for Tests at EEI Waltz Mill Station: Cable 23
Author :
Anderson, H.C. ; Rutherford, M.A. ; Cox, E.B.
Author_Institution :
GENERAL ELECTRIC COMPANY
fDate :
7/1/1972 12:00:00 AM
Abstract :
This paper covers the General Electric Company´s development, testing and installation at the Waltz Mill Station of a 138 kV solid dielectric power cable and associated splice. The cable described is unique in the industry in that (1) it utilizes a new insulation with higher breakdown strength, (2) is the only cable at Waltz Mill to use a mineral filled cross- linked polyethylene, and (3) has its insulation shield intimately bonded to the insulation.
Keywords :
Cable insulation; Cable shielding; Dielectrics and electrical insulation; Electric breakdown; Milling machines; Minerals; Mining industry; Power cables; Solids; System testing;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/TPAS.1972.293277