DocumentCode
1047455
Title
Risk-constrained electricity procurement for a large consumer
Author
Conejo, A.J. ; Carrión, M.
Author_Institution
Dept. of Electr. Eng., Univ. of Castilla-La Mancha, Ciudad Real, Spain
Volume
153
Issue
4
fYear
2006
fDate
7/13/2006 12:00:00 AM
Firstpage
407
Lastpage
413
Abstract
A solution technique is formulated and provided for the electricity procurement problem faced by a large consumer. The objective of this consumer is to minimise procurement cost while limiting the risk of cost fluctuation due to pool price volatility. Electricity sources include the pool, bilateral contracts and self-production. Uncertainty is related to electricity pool prices. A realistic case study is analysed and results presented. Conclusions are duly drawn.
Keywords
consumer behaviour; cost reduction; power markets; procurement; risk analysis; cost reduction; electricity pool price; risk-constrained electricity procurement; uncertainty;
fLanguage
English
Journal_Title
Generation, Transmission and Distribution, IEE Proceedings-
Publisher
iet
ISSN
1350-2360
Type
jour
DOI
10.1049/ip-gtd:20050466
Filename
1659666
Link To Document