DocumentCode
1053791
Title
A Maintenance Plan for Airborne Radio Equipment
Author
Bushby, T.R.W.
Author_Institution
Aviation Dept., Amalgamated Wireless (Australasia) Ltd., Sydney, N.S.W., Australia.
Issue
3
fYear
1954
Firstpage
2
Lastpage
7
Abstract
This paper briefly outlines the Australian system of maintenance for airborne radio equipment, and gives in more detail the results of a recent investigation into the reasons for, and incidence of, unscheduled removals of units. The probability of unscheduled removal, derived from the investigation data, was used as a criterion for the assessment of the optimum period between scheduled overhauls. It was found that, in many instances, the probability of failure is greatest immediately after overhaul and decreases with time. Comparisons of the performance of various types of units are given.
Keywords
Australia; Cost function; Frequency; Inspection; Preventive maintenance; Production facilities; Radio navigation; Tellurium; Testing;
fLanguage
English
Journal_Title
Aeronautical and Navigational Electronics, Transactions of the IRE Professional Group on
Publisher
ieee
ISSN
2168-0167
Type
jour
DOI
10.1109/TPGAE.1954.5062393
Filename
5062393
Link To Document