• DocumentCode
    1055039
  • Title

    The Fenno-Skan HVDC link commissioning

  • Author

    Nyman, A. ; Jääskeläinen, K. ; Vaitomaa, M. ; Jansson, B. ; Danielsson, K.-G.

  • Author_Institution
    Swedish State Power Board, Vallingby, Sweden
  • Volume
    9
  • Issue
    1
  • fYear
    1994
  • fDate
    1/1/1994 12:00:00 AM
  • Firstpage
    1
  • Lastpage
    9
  • Abstract
    The commissioning of the Fenno-Skan HVDC link between Finland and Sweden, with the longest submarine DC cable in the world, is described. The main pre-commissioning activities, important for an efficient commissioning, are discussed together with time schedules and suitable organisation forms. The procedures to test special control features, such as subsynchronous oscillation (SSO) damping control are presented. The full scale network interaction tests which are an important part of the commissioning are also discussed. These tests succeeded very well and provided a lot of information about the system behaviour for future operation and planning purposes
  • Keywords
    DC power transmission; damping; oscillations; power cables; submarine cables; Fenno-Skan HVDC link commissioning; Finland; Sweden; organisation forms; pre-commissioning activities; submarine DC cable; subsynchronous oscillation damping control; time schedules; HVDC transmission; Power cables; Power system interconnection; Power system planning; Power system reliability; Power system stability; Power systems; Power transmission; Testing; Underwater vehicles;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/61.277675
  • Filename
    277675