DocumentCode
1064108
Title
Series production of the superconducting HERA dipole magnets
Author
Dustmann, C.H. ; Forster, M. ; Bonmann, D.
Author_Institution
Brown Boveri Co., Mannheim, West Germany
Volume
24
Issue
2
fYear
1988
fDate
3/1/1988 12:00:00 AM
Firstpage
1338
Lastpage
1341
Abstract
A production flowchart is presented for series production of 223 superconducting Hadron Electron Ring Accelerator dipoles at a rate of one magnet per day. Special emphasis has been placed on the quality-assurance system and on quality control. The production-workflow topics described are: winding and curling of half coils, insulating and collaring, stacking of half yokes, coil-to-yoke assembly, mounting and welding of He vessel half shells and end plates, electrical switchwork, multilayer insulation and heat-shield application, and insertion of magnet and heat shield into the vacuum vessel.
Keywords
beam handling techniques; electron ring accelerators; particle accelerator accessories; quality control; superconducting magnets; Hadron Electron Ring Accelerator; assembly; collaring; curling; insulating; mounting; quality control; quality-assurance system; series production; stacking; superconducting dipole magnets; welding; winding; Accelerator magnets; Dielectrics and electrical insulation; Electron accelerators; Flowcharts; Production; Quality control; Resistance heating; Stacking; Superconducting coils; Superconducting magnets;
fLanguage
English
Journal_Title
Magnetics, IEEE Transactions on
Publisher
ieee
ISSN
0018-9464
Type
jour
DOI
10.1109/20.11486
Filename
11486
Link To Document