• DocumentCode
    1064108
  • Title

    Series production of the superconducting HERA dipole magnets

  • Author

    Dustmann, C.H. ; Forster, M. ; Bonmann, D.

  • Author_Institution
    Brown Boveri Co., Mannheim, West Germany
  • Volume
    24
  • Issue
    2
  • fYear
    1988
  • fDate
    3/1/1988 12:00:00 AM
  • Firstpage
    1338
  • Lastpage
    1341
  • Abstract
    A production flowchart is presented for series production of 223 superconducting Hadron Electron Ring Accelerator dipoles at a rate of one magnet per day. Special emphasis has been placed on the quality-assurance system and on quality control. The production-workflow topics described are: winding and curling of half coils, insulating and collaring, stacking of half yokes, coil-to-yoke assembly, mounting and welding of He vessel half shells and end plates, electrical switchwork, multilayer insulation and heat-shield application, and insertion of magnet and heat shield into the vacuum vessel.
  • Keywords
    beam handling techniques; electron ring accelerators; particle accelerator accessories; quality control; superconducting magnets; Hadron Electron Ring Accelerator; assembly; collaring; curling; insulating; mounting; quality control; quality-assurance system; series production; stacking; superconducting dipole magnets; welding; winding; Accelerator magnets; Dielectrics and electrical insulation; Electron accelerators; Flowcharts; Production; Quality control; Resistance heating; Stacking; Superconducting coils; Superconducting magnets;
  • fLanguage
    English
  • Journal_Title
    Magnetics, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9464
  • Type

    jour

  • DOI
    10.1109/20.11486
  • Filename
    11486