• DocumentCode
    107269
  • Title

    Robust Energy and Reserve Dispatch Under Variable Renewable Generation

  • Author

    Wei Wei ; Feng Liu ; Shengwei Mei ; Yunhe Hou

  • Author_Institution
    Dept. of Electr. Eng., Tsinghua Univ., Beijing, China
  • Volume
    6
  • Issue
    1
  • fYear
    2015
  • fDate
    Jan. 2015
  • Firstpage
    369
  • Lastpage
    380
  • Abstract
    Global warming and environmental pollution concerns have promoted dramatic integrations of renewable energy sources all over the world. Associated with benefits of environmental conservation, essentially uncertain and variable characteristics of such energy resources significantly challenge the operation of power systems. In order to implement reliable and economical operations, a robust energy and reserve dispatch (RERD) model is proposed in this paper, in which the operating decisions are divided into pre-dispatch and re-dispatch. A robust feasibility constraint set is imposed on pre-dispatch variables, such that operation constraints can be recovered by adjusting re-dispatch after wind generation realizes. The model is extended to more general dispatch decision making problems involving uncertainties in the framework of adjustable robust optimization. By revealing the convexity of the robust feasibility constraint set, a comprehensive mixed integer linear programming based oracle is presented to verify the robust feasibility of pre-dispatch decisions. A cutting plane algorithm is established to solve associated optimization problems. The proposed model and method are applied to a five-bus system as well as a realistic provincial power grid in China. Numeric experiments demonstrate that the proposed methodology is effective and efficient.
  • Keywords
    decision making; global warming; integer programming; linear programming; power generation dispatch; power generation economics; power grids; renewable energy sources; wind power plants; RERD model; adjustable robust optimization; cutting plane algorithm; economical operations; environmental conservation; environmental pollution; five-bus system; general dispatch decision making problems; global warming; mixed integer linear programming based oracle; operating decisions; power system operation; predispatch decisions; realistic provincial power grid; redispatch decisions; renewable energy sources; robust energy and reserve dispatch model; robust feasibility constraint set; uncertain characteristics; variable characteristics; variable renewable generation; wind generation; Optimization; Power systems; Robustness; Uncertainty; Wind farms; Wind forecasting; Adjustable robust optimization; energy and reserve dispatch; mixed integer linear programming; renewable power generation; uncertainty;
  • fLanguage
    English
  • Journal_Title
    Smart Grid, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1949-3053
  • Type

    jour

  • DOI
    10.1109/TSG.2014.2317744
  • Filename
    6862932