DocumentCode :
107269
Title :
Robust Energy and Reserve Dispatch Under Variable Renewable Generation
Author :
Wei Wei ; Feng Liu ; Shengwei Mei ; Yunhe Hou
Author_Institution :
Dept. of Electr. Eng., Tsinghua Univ., Beijing, China
Volume :
6
Issue :
1
fYear :
2015
fDate :
Jan. 2015
Firstpage :
369
Lastpage :
380
Abstract :
Global warming and environmental pollution concerns have promoted dramatic integrations of renewable energy sources all over the world. Associated with benefits of environmental conservation, essentially uncertain and variable characteristics of such energy resources significantly challenge the operation of power systems. In order to implement reliable and economical operations, a robust energy and reserve dispatch (RERD) model is proposed in this paper, in which the operating decisions are divided into pre-dispatch and re-dispatch. A robust feasibility constraint set is imposed on pre-dispatch variables, such that operation constraints can be recovered by adjusting re-dispatch after wind generation realizes. The model is extended to more general dispatch decision making problems involving uncertainties in the framework of adjustable robust optimization. By revealing the convexity of the robust feasibility constraint set, a comprehensive mixed integer linear programming based oracle is presented to verify the robust feasibility of pre-dispatch decisions. A cutting plane algorithm is established to solve associated optimization problems. The proposed model and method are applied to a five-bus system as well as a realistic provincial power grid in China. Numeric experiments demonstrate that the proposed methodology is effective and efficient.
Keywords :
decision making; global warming; integer programming; linear programming; power generation dispatch; power generation economics; power grids; renewable energy sources; wind power plants; RERD model; adjustable robust optimization; cutting plane algorithm; economical operations; environmental conservation; environmental pollution; five-bus system; general dispatch decision making problems; global warming; mixed integer linear programming based oracle; operating decisions; power system operation; predispatch decisions; realistic provincial power grid; redispatch decisions; renewable energy sources; robust energy and reserve dispatch model; robust feasibility constraint set; uncertain characteristics; variable characteristics; variable renewable generation; wind generation; Optimization; Power systems; Robustness; Uncertainty; Wind farms; Wind forecasting; Adjustable robust optimization; energy and reserve dispatch; mixed integer linear programming; renewable power generation; uncertainty;
fLanguage :
English
Journal_Title :
Smart Grid, IEEE Transactions on
Publisher :
ieee
ISSN :
1949-3053
Type :
jour
DOI :
10.1109/TSG.2014.2317744
Filename :
6862932
Link To Document :
بازگشت