• DocumentCode
    1073219
  • Title

    Behavioral Transition: A Framework for the Construction Conflict--Tension Relationship

  • Author

    Yiu, Tak Wing ; Sai On Cheung

  • Author_Institution
    Hong Kong City Univ., Kowloon
  • Volume
    54
  • Issue
    3
  • fYear
    2007
  • Firstpage
    498
  • Lastpage
    505
  • Abstract
    Conflicts are inevitable in construction projects. One of the reasons is that all construction projects involve complex human interactions. Previous studies have shown that behavioral states can respond dynamically as the magnitude of a conflict increases. This has been empirically demonstrated using a catastrophe-theory-based, three-variable system involving the level of construction conflict, the level of tension, and the amount of behavioral flexibility (Yiu and Cheung, 2006). This paper reports on a study that builds on the above-mentioned study by Yiu and Cheung, and examines the application of moderated multiple regression (MMR) to the three-variable system. It was found that not all MMR models display a significant moderating effect. Two out of six MMR models were found to be significant in their effect. These models affirm that the nature of the relationship between the degree of uncertainty and adversarial attitudes (or mistrust level) varies, depending on the behavioral flexibility of the parties. Disordinal interactions were also found, suggesting that the interaction between behavioral flexibility and the conflict-tension relationship can change radically. Critical points for the degree of uncertainty were also able to be calculated. Beyond these points, even a flexible individual may find difficulty in minimizing or resolving construction conflicts. As such, it is suggested that such radical changes could be prevented by minimizing the degree of uncertainty in construction projects.
  • Keywords
    catastrophe theory; construction industry; human factors; industrial psychology; project management; regression analysis; behavioral flexibility; behavioral transition; catastrophe-theory-based system; complex human interactions; construction conflict-tension relationship; construction project; disordinal interactions; moderated multiple regression; three-variable system; Atmosphere; Buildings; Collaborative work; Construction industry; Councils; Displays; Engineering management; Humans; Project management; Uncertainty; Behavioral flexibility; construction conflicts; moderated multiple regression (MMR); tension;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/TEM.2007.900784
  • Filename
    4278021