• DocumentCode
    1075659
  • Title

    Electricity supplies for Addu Atoll

  • Author

    Brown, J. ; Maylin, R.F.

  • Volume
    3
  • Issue
    1
  • fYear
    1989
  • fDate
    1/1/1989 12:00:00 AM
  • Firstpage
    17
  • Lastpage
    26
  • Abstract
    The authors assess the rehabilitation requirements of power plant and power supplies for the public electricity undertakings of the Maldives Electricity Board in Male, the capital of the Republic of Maldives, and in particular Addu Atoll. The Maldives Electricity Board (MEB) is a Government owned organisation established in 1982. It is the statutory body responsible for public electricity supplies throughout the Republic of Maldives and responsible to the office of the President. The MEB systems operate at a frequency of 50 Hz and the voltages in use are 11 kV, 3.3 kV and 0.4 kV
  • Keywords
    electricity supply industry; 0.4 kV; 11 kV; 3.3 kV; 50 Hz; Addu Atoll; MEB; Maldives; electricity supply industry; power plant; power supplies; public electricity supplies;
  • fLanguage
    English
  • Journal_Title
    Power Engineering Journal
  • Publisher
    iet
  • ISSN
    0950-3366
  • Type

    jour

  • Filename
    28137