DocumentCode :
1078981
Title :
A Survey of Methods for Planning and Analyzing Accelerated Tests
Author :
Nelson, Wayne
Author_Institution :
Research and Development Center, General Electric Company, Schenectady, N. Y. 12301
Issue :
1
fYear :
1974
fDate :
3/1/1974 12:00:00 AM
Firstpage :
12
Lastpage :
18
Abstract :
This paper surveys methods for planning and analyzing accelerated life tests. Many of these methods are new and providemore informative results for less time and cost than do previous methods. These methods are of value to all who plan and analyze accelerated tests on any product or material.
Keywords :
Acceleration; Costs; Data analysis; Failure analysis; Information analysis; Life estimation; Life testing; Materials testing; Statistical analysis; Stress;
fLanguage :
English
Journal_Title :
Electrical Insulation, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9367
Type :
jour
DOI :
10.1109/TEI.1974.299289
Filename :
4081797
Link To Document :
بازگشت