DocumentCode
1083736
Title
On How Often the Supervisor Should Sample
Author
Sheridan, Thomas B.
Author_Institution
Department of Mechanical Engineering, Massachusetts Institute of Technology, Cambridge, Mass. 02139
Volume
6
Issue
2
fYear
1970
fDate
4/1/1970 12:00:00 AM
Firstpage
140
Lastpage
145
Abstract
A procedure is presented for specifying how long a supervisor or monitor of a process should wait between input samples to maximize a given value or payoff function, assuming he resets the controls with each sample as a function of the best information he has. The procedure is based upon Bayesian preposterior information analysis.
Keywords
Automation; Constraint optimization; Control systems; Error correction codes; Information theory; Job shop scheduling; Linear programming; Operations research; Power generation; Redundancy;
fLanguage
English
Journal_Title
Systems Science and Cybernetics, IEEE Transactions on
Publisher
ieee
ISSN
0536-1567
Type
jour
DOI
10.1109/TSSC.1970.300289
Filename
4082306
Link To Document