• DocumentCode
    109687
  • Title

    Transition From Construction to Operation Phase of the Wendelstein 7-X Stellarator

  • Author

    Bosch, Hans-Stephan ; Brakel, R. ; Gasparotto, M. ; Grote, Heinz ; Hartmann, D.A. ; Herrmann, Ralf ; Nagel, Michael ; Naujoks, D. ; Otte, Michael ; Risse, K. ; Rummel, T. ; Werner, Axel

  • Author_Institution
    Max-Planck-Inst. for Plasma Phys., EURATOM Assoc., Greifswald, Germany
  • Volume
    42
  • Issue
    3
  • fYear
    2014
  • fDate
    Mar-14
  • Firstpage
    432
  • Lastpage
    438
  • Abstract
    Assembly of the superconducting stellarator Wendelstein 7-X is well advanced, and commissioning of the device is being prepared. A first draft of the commissioning tasks has been developed and will be discussed in this paper.
  • Keywords
    stellarators; Wendelstein 7-X stellarator; commissioning tasks; construction phase; operation phase; superconducting stellarator; Assembly; Coils; Helium; Integrated circuits; Magnetic separation; Plasmas; Toroidal magnetic fields; Commissioning; Wendelstein 7-X; operation;
  • fLanguage
    English
  • Journal_Title
    Plasma Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-3813
  • Type

    jour

  • DOI
    10.1109/TPS.2014.2304012
  • Filename
    6746151