Interface requirements of a large hydroelectric power plant with its regional load dispatch office
Author :
Castro, Francisco ; Dal Monte, R.
Volume :
5
Issue :
2
fYear :
1990
fDate :
6/1/1990 12:00:00 AM
Firstpage :
299
Lastpage :
303
Abstract :
The real-time interface requirements of a large hydroelectric power plant with its regional load dispatch office are described. The operative arrangement, interfacing functions, annual and weekly generation schedule, and unit commitment are discussed. Automatic generation control, automatic bus voltage, river flow control, and operating conditions are discussed. All the functions were implemented for the Guri Hydroelectric Project in Venezuela, with total generating capacity of 10000 MW. Operation management functions are all handled by the Guri Computer Control System
Keywords :
hydroelectric power stations; load dispatching; power engineering computing; 10000 MW; Guri Computer Control System; Guri Hydroelectric Project; Venezuela; automatic bus voltage; automatic generation control; hydroelectric power plant; operating conditions; operation management functions; real-time interface; regional load dispatch office; river flow control; unit commitment; Automatic generation control; Automatic voltage control; Computer interfaces; Computer networks; Control systems; Data flow computing; Power engineering and energy; Power generation; Processor scheduling; Standby generators;
fLanguage :
English
Journal_Title :
Energy Conversion, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8969
Type :
jour
DOI :
10.1109/60.107225
Filename :
107225
Link To Document :
بازگشت