DocumentCode
1103366
Title
Rates and Rate Making
Author
Lincoln, Paul M.
Issue
2
fYear
1915
fDate
7/1/1915 12:00:00 AM
Firstpage
2279
Lastpage
2360
Abstract
The necessity of recognizing load factor in rate schedules is emphasized. To obtain load factor necessitates the measurement of maximum demand; a new maximum demand meter is described which depends upon heat and heat storage. The theory of such meters is discussed. A new method of measuring power factor and volt-amperes is disclosed and a method of recognizing power factor in the rate for electric service is discussed.
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1915.4765295
Filename
4765295
Link To Document