Some Problems in the Operation of Power Plants in Parallel
Author
Stone, E.C.
Issue
2
fYear
1919
fDate
7/1/1919 12:00:00 AM
Firstpage
1651
Lastpage
1674
Abstract
In order to operate two power plants satisfactorily in parallel, the transmission line which ties them together must have sufficient synchronizing power, as well as sufficient carrying capacity. The ``synchronizing power´´ of a line depends upon its resistance and reactance, the bus voltages maintained at its ends, and the maximum kilovolt-amperes it must transmit. The ability of different lines to provide satisfactory parallel operation cannot be measured by any standard which does not take account of all of these factors. Limiting values for ``synchronizing power´´ of lines under various operating conditions are given. The division of load between two plants in parallel is regulated by steam control; the division of wattless current associated with the load depends upon the voltages generated and may be in proportion to the division of real load, when the difference in voltage at the two busses will vary with the load transmitted, or may be arbitrary so that regardless of the load transmitted, the voltages on the two busses will be maintained constant. The latter plan generally gives better operating conditions on the system as a whole, but creates demands for wattless currents at either or both plants in excess of their normal capacity, and in so doing, involves an additional cost.
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1919.4765651
Filename
4765651
Link To Document