DocumentCode :
1108097
Title :
Power system transmission network expansion planning using AC model
Author :
Rider, M.J. ; Garcia, A.V. ; Romero, R.
Author_Institution :
Univ. of Campinas, Campinas
Volume :
1
Issue :
5
fYear :
2007
fDate :
9/1/2007 12:00:00 AM
Firstpage :
731
Lastpage :
742
Abstract :
An optimisation technique to solve transmission network expansion planning problem, using the AC model, is presented. This is a very complex mixed integer nonlinear programming problem. A constructive heuristic algorithm aimed at obtaining an excellent quality solution for this problem is presented. An interior point method is employed to solve nonlinear programming problems during the solution steps of the algorithm. Results of the tests, carried out with three electrical energy systems, show the capabilities of the method and also the viability of using the AC model to solve the problem.
Keywords :
heuristic programming; integer programming; load flow; nonlinear programming; power transmission planning; AC model; complex mixed integer nonlinear programming problem; constructive heuristic algorithm; electrical energy system; interior point method; optimisation technique; power system transmission network; transmission network expansion planning;
fLanguage :
English
Journal_Title :
Generation, Transmission & Distribution, IET
Publisher :
iet
ISSN :
1751-8687
Type :
jour
DOI :
10.1049/iet-gtd:20060465
Filename :
4295000
Link To Document :
بازگشت