Title :
Salient Electrical Design Features of the Magat Hydroelectric Project
Author :
Verma, R. ; Samorio, R.
Author_Institution :
Shawinigan Consultants Inc., Montreal, Qué., Canada
fDate :
6/1/1987 12:00:00 AM
Abstract :
The Magat River Multipurpose project on the Luzon grid of the National Power Corporation of the Philippines consists of a four unit 450 MVA power-plant placed in service towards end of year 1983 and early 1984, providing an additional installed capacity of 360 MW to the existing generation peak capacity of 2478 MW [1] of the Luzon grid, which is the country´ s largest grid with an installed capacity of 3906 MW, the other two being those of Visayas and Mindanao with a total installed capacity of 1095 MW.
Keywords :
Conductors; Grounding; Mesh generation; Power generation; Power transformers; Protection; Protective relaying; Stators; Steel; Synchronous generators;
Journal_Title :
Energy Conversion, IEEE Transactions on
DOI :
10.1109/TEC.1987.4765830