    Salient Electrical Design Features of the Magat Hydroelectric Project

  • Author

    Verma, R. ; Samorio, R.

  • Author_Institution
    Shawinigan Consultants Inc., Montreal, Qué., Canada
  • Issue
    2
  • fYear
    1987
  • fDate
    6/1/1987 12:00:00 AM
  • Firstpage
    201
  • Lastpage
    207
  • Abstract
    The Magat River Multipurpose project on the Luzon grid of the National Power Corporation of the Philippines consists of a four unit 450 MVA power-plant placed in service towards end of year 1983 and early 1984, providing an additional installed capacity of 360 MW to the existing generation peak capacity of 2478 MW [1] of the Luzon grid, which is the country´ s largest grid with an installed capacity of 3906 MW, the other two being those of Visayas and Mindanao with a total installed capacity of 1095 MW.
  • Keywords
    Conductors; Grounding; Mesh generation; Power generation; Power transformers; Protection; Protective relaying; Stators; Steel; Synchronous generators;
  • fLanguage
    English
  • Journal_Title
    Energy Conversion, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8969
  • Type

    jour

  • DOI
    10.1109/TEC.1987.4765830
  • Filename
    4765830