DocumentCode
1112782
Title
Ferroresonance During Single-Phase Switching of 3-Phase Distribution Transformer Banks
Author
Hopkinson, R.H.
Author_Institution
General Electric Company, Schenectady, N. Y.
Volume
84
Issue
4
fYear
1965
fDate
4/1/1965 12:00:00 AM
Firstpage
289
Lastpage
293
Abstract
It is possible to obtain ferroresonant overvoltages during single-phase switching of distribution transformer banks. When energizing the bank with single-pole devices at higher distribution voltage, the internal winding capacitances of ungrounded wye-delta banks can react with the bank saturation characteristics producing high sustained overvoltages. Transient network analyzer (TNA) studies have determined the necessary conditions for the occurrence of the phenomena and have investigated remedies. One promising solution is the substitution of wye-wye grounded banks for the ungrounded wye-delta banks on 19.9/34.5-kV distribution circuits.
Keywords
Capacitance; Circuit faults; Conductors; Ferroresonance; Joining processes; Power cables; Surges; Switching circuits; Transient analysis; Voltage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1965.4766193
Filename
4766193
Link To Document