• DocumentCode
    1113008
  • Title

    Second Interim Report-Minimum Electrical Clearances for Substations Based on Switching Surge Requirements

  • Author

    IEEE Committee Report

  • Volume
    84
  • Issue
    5
  • fYear
    1965
  • fDate
    5/1/1965 12:00:00 AM
  • Firstpage
    415
  • Lastpage
    417
  • Abstract
    The Working Group on Project 59.1 of the Transmission Substations Subcommittee of the IEEE Substations Committee is preparing a Guide for Minimum Electrical Clearances for Substations. This paper presents an interim report of tentative recommendations for clearances in substations rated 230 kV and higher, and based on switching surge considerations. Clearances for line-to-ground insulation systems have been based upon rod-to-plane switching surge test data. Phase-to-phase clearances have been based on rod-to-rod switching surge test data. Clearances are determined for a variety of switching surge levels and probabilities that the maximum transient voltage will be withstood.
  • Keywords
    Conductors; Dielectrics and electrical insulation; Impulse testing; Insulation testing; Printing; Shunt (electrical); Substations; Surges; System testing; Voltage control;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1965.4766214
  • Filename
    4766214