• DocumentCode
    1113026
  • Title

    Duty Cycle Testing of Current Limiting Station and Intermediate Lightning Arresters

  • Author

    Sakshaug, E.C. ; Carpenter, T.J. ; Stetson, E.W.

  • Author_Institution
    General Electric Company, Pittsfield, Mass.
  • Volume
    84
  • Issue
    5
  • fYear
    1965
  • fDate
    5/1/1965 12:00:00 AM
  • Firstpage
    422
  • Lastpage
    425
  • Abstract
    The testing of lightning arresters has been reasonably well defined by ASA C62.1-1962, but the comparatively recent development of current limiting arresters makes it necessary to re-examine some industry standards to determine whether they provide adequate proof of current limiting arrester performance. The duty cycle test requires revision because it does not subject lightning arresters to a rate-of-rise of current comparable with what might be obtained in service. Tests must be made with higher rates-of-rise to insure that failure of loss of protective characteristics will not occur under actual service conditions.
  • Keywords
    Arresters; Current limiters; Frequency; Impulse testing; Lightning; Protective relaying; Surge protection; Valves; Voltage control; Zero voltage switching;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1965.4766216
  • Filename
    4766216