Construction details and test results from RHIC sextupoles
Author :
Lindner, M. ; Anerella, M. ; Ganetis, G. ; Garber, M. ; Ghosh, A. ; Greene, A. ; Gupta, R. ; Jain, A. ; Kahn, S. ; Kelly, E. ; Killian, E. ; Morgan, G. ; Prodell, A. ; Rehak, M. ; Robins, K. ; Sampson, W. ; Shutt, R. ; Thomas, R. ; Thompson, P. ; Wanderer
Author_Institution :
RHIC Project, Brookhaven Nat. Lab., Upton, NY, USA
fDate :
7/1/1994 12:00:00 AM
Abstract :
Four 8 cm aperture sextupoles have been built at BNL to verify the magnetic performance of this magnet in the RHIC installation. Two significantly different mechanical configurations have been designed, and two magnets of each design have been built, and successfully tested, and have exceeded the required minimum quench current by a substantial margin. This report describes the assembly details of the second configuration, which is the final production configuration. In addition the first industry built production sextupole has been delivered and tested. This report presents the results of quench tests on all 5 magnets and field measurements on the first production sextupole
Keywords :
beam handling equipment; ion accelerators; storage rings; superconducting magnets; superconducting transition temperature; synchrotrons; RHIC sextupoles; magnetic performance; mechanical configurations; minimum quench current; quench tests; Apertures; Assembly; Boring; Cryogenics; Production; Saturation magnetization; Superconducting coils; Superconducting magnets; Testing; Wire;
Journal_Title :
Magnetics, IEEE Transactions on