DocumentCode :
1144489
Title :
Clock synchronization on the factory floor (FMS)
Author :
Gora, Walter ; Herzog, Ulrich ; Tripathi, Satish K.
Author_Institution :
Comput. Archit. & Performance Evaluation, Erlangen Univ., Nuremberg, West Germany
Volume :
35
Issue :
3
fYear :
1988
fDate :
8/1/1988 12:00:00 AM
Firstpage :
372
Lastpage :
380
Abstract :
The coordination of flexible manufacturing systems (FMS) in an automated factory requires that synchronization amongst the manufacturing processes be based on a common clock. The synchronization requirements on the factory floor are described, and several clock synchronization algorithms, their theoretical bounds, and the results of the authors´ work are discussed. Measurement results based on the implementation of such synchronization algorithms on local area networks (LAN) are presented. For hierarchical LANs, an algorithm is developed and its behavior simulated
Keywords :
clocks; flexible manufacturing systems; local area networks; synchronisation; FMS; automated factory; clock synchronization; flexible manufacturing systems; hierarchical LANs; local area networks; manufacturing processes; synchronization algorithms; Automatic control; Clocks; Computer aided manufacturing; Control systems; Flexible manufacturing systems; Manufacturing automation; Production facilities; Production systems; Protocols; Synchronization;
fLanguage :
English
Journal_Title :
Industrial Electronics, IEEE Transactions on
Publisher :
ieee
ISSN :
0278-0046
Type :
jour
DOI :
10.1109/41.3109
Filename :
3109
Link To Document :
بازگشت