• DocumentCode
    1145017
  • Title

    Discussion of: "Statistical and dynamic analysis of generation control performance standards"

  • Author

    Blohm, R.

  • Author_Institution
    Joint Inadvertent Interchange Taskforce, North American Electr. Reliability Council, Princeton, NJ, USA
  • Volume
    18
  • Issue
    1
  • fYear
    2003
  • Firstpage
    408
  • Lastpage
    409
  • Abstract
    The author comments on the original paper ("Statistical and dynamic analysis of generation control performance standards", T. Sasaki et al., see ibid., vol.17 p.476-81, 2002). He argues that the basic concepts of the paper are obscured because they are presented from the implicit perspective of the bundled integrated utility with four hidden assumptions concerning loads mismatch, overscheduled load, the interconnection always just meeting bias obligation and relation between average size of control error and capacity.
  • Keywords
    control system analysis; load (electric); power generation control; standards; statistical analysis; control error; dynamic analysis; generation control performance standards analysis; interconnected operation; loads mismatch; overscheduled load; paper discussion; primary frequency response; secondary frequency control; statistical analysis; Analytical models; Councils; Delay; Equations; Error correction; Frequency control; Organizing; Performance analysis; Power system interconnection; Testing;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2002.807056
  • Filename
    1178830