DocumentCode :
1147336
Title :
Planning and Protection Implications of Reduced Fault-Withstand Time of Power Transformers
Author :
Brown, Roland W. ; Khan, Shoaib
Author_Institution :
SNC Inc., Montreal, Quebec, Canada
Volume :
1
Issue :
4
fYear :
1986
Firstpage :
60
Lastpage :
67
Abstract :
The recent revisions (1980-1983) to the standards for power transformers in both the U.S.A. and Canada call for corresponding revisions in many related planning and protection practices. Particularly, it is found that the reduction to 2 seconds for maximum through faults on transformers and the necessity to include a value for system impedance in the specification of the larger transformers will have significant effects on previous practices for planning, protection, operations, loading and specification. This paper discusses a number of these effects, with an emphasis from a protection point of view.
Keywords :
ANSI standards; Impedance; Meeting planning; Power system planning; Power system protection; Power transformers; Proposals; Standards publication; Temperature; Transformers, Regulators and Reactors - c57;
fLanguage :
English
Journal_Title :
Power Delivery, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8977
Type :
jour
DOI :
10.1109/TPWRD.1986.4308030
Filename :
4308030
Link To Document :
بازگشت