DocumentCode :
1151231
Title :
Operation at Low Frequency in Great Britain [includes discussion]
Author :
Squire, P.J.
Author_Institution :
NONMEMBER AIEE, British Electricity Authority, London, England.
Volume :
73
Issue :
2
fYear :
1954
Abstract :
Since World War II serious plant shortage in Britain has necessitated load shedding during the winter peak periods. Load reductions were effected by reducing frequency and voltage and on occasions by disconnecting some supplies. This report summarizes the experience of operation at low frequency in Britain and indicates its effect on demand.
Keywords :
Electric breakdown; Frequency estimation; Low voltage; Manufacturing; Power engineering and energy; Power generation; Production; Space heating; Systems engineering and theory; Transmission lines;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher :
ieee
ISSN :
0097-2460
Type :
jour
DOI :
10.1109/AIEEPAS.1954.4499014
Filename :
4499014
Link To Document :
بازگشت