Title :
Operation at Low Frequency in Great Britain [includes discussion]
Author_Institution :
NONMEMBER AIEE, British Electricity Authority, London, England.
Abstract :
Since World War II serious plant shortage in Britain has necessitated load shedding during the winter peak periods. Load reductions were effected by reducing frequency and voltage and on occasions by disconnecting some supplies. This report summarizes the experience of operation at low frequency in Britain and indicates its effect on demand.
Keywords :
Electric breakdown; Frequency estimation; Low voltage; Manufacturing; Power engineering and energy; Power generation; Production; Space heating; Systems engineering and theory; Transmission lines;
Journal_Title :
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
DOI :
10.1109/AIEEPAS.1954.4499014