DocumentCode :
1151485
Title :
Keep on running [train maintenance facility]
Author :
Sharpe, Lorna
Volume :
50
Issue :
9
fYear :
2004
Firstpage :
40
Lastpage :
42
Abstract :
Siemens had to think long-term when a billion pound train contract included 20-year performance guarantees. This article outlines the company´s 25 m pound investment in a state of the art maintenance facility designed to make sure trains in the south of England stay in top condition. It describes the workshop in detail, including access, building management system, bogie changing equipment, maintenance monitoring and control, security, and fire detection.
Keywords :
building management systems; locomotives; maintenance engineering; process control; process monitoring; railway engineering; railways; security; smoke detectors; bogie changing equipment; building management system; fire detection; long-term performance guarantees; maintenance control; maintenance monitoring; security; train maintenance facility; workshop access;
fLanguage :
English
Journal_Title :
IEE Review
Publisher :
iet
ISSN :
0953-5683
Type :
jour
DOI :
10.1049/ir:20040902
Filename :
1352746
Link To Document :
بازگشت