• DocumentCode
    1151485
  • Title

    Keep on running [train maintenance facility]

  • Author

    Sharpe, Lorna

  • Volume
    50
  • Issue
    9
  • fYear
    2004
  • Firstpage
    40
  • Lastpage
    42
  • Abstract
    Siemens had to think long-term when a billion pound train contract included 20-year performance guarantees. This article outlines the company´s 25 m pound investment in a state of the art maintenance facility designed to make sure trains in the south of England stay in top condition. It describes the workshop in detail, including access, building management system, bogie changing equipment, maintenance monitoring and control, security, and fire detection.
  • Keywords
    building management systems; locomotives; maintenance engineering; process control; process monitoring; railway engineering; railways; security; smoke detectors; bogie changing equipment; building management system; fire detection; long-term performance guarantees; maintenance control; maintenance monitoring; security; train maintenance facility; workshop access;
  • fLanguage
    English
  • Journal_Title
    IEE Review
  • Publisher
    iet
  • ISSN
    0953-5683
  • Type

    jour

  • DOI
    10.1049/ir:20040902
  • Filename
    1352746