• DocumentCode
    1151952
  • Title

    Batch process automation - APPLYING THE PRINCIPLES OF BATCH AUTOMATION AND SELECTING A SUITABLE CONTROL SYSTEM AND SUPPLIER IS ONLY PART OF THE STORY. MANAGING A BATCH AUTOMATION PROJECT REQUIRES CONSIDERATIONS OVER AND ABOVE THOSE NEEDED FOR THE AUTOMATI

  • Author

    James, David

  • Author_Institution
    Invensys Process Syst.
  • Volume
    85
  • Issue
    6
  • fYear
    2006
  • Firstpage
    36
  • Lastpage
    41
  • Abstract
    Batch processes, by their very nature, are rarely in a steady state for any great length of time. This constant change of plant and process state results in a level of complexity of the automation of the process that is not found in continuous processes such as refining. However, even with a sound understanding of the principles of batch automation, with a chosen control system and batch management software, and with a supplier with whom you believe you can work, there is still the need to manage the project development process. By performing a structured analysis based on the ISA 88.01 models and using the power of modern day control systems and batch management packages, a flexible production system can be produced on time and to budget
  • Keywords
    batch processing (industrial); control engineering computing; flexible manufacturing systems; production control; production engineering computing; project management; ISA 88.01 models; batch management software; batch process automation; control system; flexible production system; project development process management; refining; structured analysis;
  • fLanguage
    English
  • Journal_Title
    Manufacturing Engineer
  • Publisher
    iet
  • ISSN
    0956-9944
  • Type

    jour

  • Filename
    4104827