DocumentCode
1151952
Title
Batch process automation - APPLYING THE PRINCIPLES OF BATCH AUTOMATION AND SELECTING A SUITABLE CONTROL SYSTEM AND SUPPLIER IS ONLY PART OF THE STORY. MANAGING A BATCH AUTOMATION PROJECT REQUIRES CONSIDERATIONS OVER AND ABOVE THOSE NEEDED FOR THE AUTOMATI
Author
James, David
Author_Institution
Invensys Process Syst.
Volume
85
Issue
6
fYear
2006
Firstpage
36
Lastpage
41
Abstract
Batch processes, by their very nature, are rarely in a steady state for any great length of time. This constant change of plant and process state results in a level of complexity of the automation of the process that is not found in continuous processes such as refining. However, even with a sound understanding of the principles of batch automation, with a chosen control system and batch management software, and with a supplier with whom you believe you can work, there is still the need to manage the project development process. By performing a structured analysis based on the ISA 88.01 models and using the power of modern day control systems and batch management packages, a flexible production system can be produced on time and to budget
Keywords
batch processing (industrial); control engineering computing; flexible manufacturing systems; production control; production engineering computing; project management; ISA 88.01 models; batch management software; batch process automation; control system; flexible production system; project development process management; refining; structured analysis;
fLanguage
English
Journal_Title
Manufacturing Engineer
Publisher
iet
ISSN
0956-9944
Type
jour
Filename
4104827
Link To Document